PROJECT

 

50th St. - I-480, Omaha, CN 22855, NH-MTIS-80-9(203)

   
Delivery Method:  Design-Build
Advertisement Date:  May 5, 2026
Notice of Cancellation - 2/27/2026

Request for Qualifications (RFQ)
Submittal Deadline:  
June 8, 2026 (12:00 p.m. CT)

  • Amendment 1 to the Request for Qualifications (RFQ)
  • Request for Qualifications (RFQ) 
  • RFQ Exhibit A   
  • RFQ Exhibit B   
  • RFQ Forms (A-H)   
  • Form A Transmittal Letter
  • Form B-1 Proposer’s Organization Information
  • Form B-2 Major Participant and Designer Certification
  • Form B-3 DBE Goal Declaration Affidavit
  • Form D Safety Questionnaire
  • Form E Category B Key Personnel Experience
  • Form F-1 Firm Experience
  • Form F-2 Past Performance
  • Form G-1 Category A Key Personnel Experience and Resumé Instructions
  • Form G-2 Category A Key Personnel Work Assignment Commitment of Availability
  • Form H Proposer Questions
  • Questions and Responses – 2/13/2026
  • RFQ Redline Changes
  • Industry Outreach Meeting – 1/13/2026

 

Key Repairs:

  • Reconstruction of the existing pavement within the project limits.
  • Widening of one additional lane in the westbound direction to improvement operations through the 42nd Street interchange.
  • Improvements such as  lighting upgrades, curb & flume, culvert work, bridge repairs, bridge deck replacement, bridge approach replacement, bridge widening, and guardrail replacement.
  • The 42nd Street Interchange ramps may be realigned to connect to the widened I-80 Mainline pavement.
  • The bridges over 42nd Street (Structure Numbers S080 45180L and S080 45180R) will be rehabilitated and widened for both directions.
    • The westbound direction will match the additional lane within this project.
    • The eastbound direction will accommodate the future 6th lane with the on-loop across the bridge before merging into I-80.
  • The bridge carrying 36th Street (Structure Number S080 45231) will be repaired.
  • The bridges over 50th Street (Structure Numbers S080 45103L and S080 45103R) will be rehabilitated.
  • The bridge carrying 36th Street (Structure Number S080 45231) will be repaired.
  • The bridge over Union Pacific Railroad (Structure Number S080 45252) will be repaired.
  • The bridge carrying 32nd Avenue (Structure Number S080 45266) will be repaired.
  • This project will be constructed under traffic with lane closures controlled by appropriate traffic control devices and practices.
  • Construction activities may be required to be accomplished at night.
  • No Additional property rights are anticipated to be required to build this project

 

The project is approximately 1.8 miles in length and is located on I-80 in Douglas County, starting approximately just west of the bridges carrying I-80 over 50th Street and extending east to approximately just west of the bridges carrying I-80 over the I-480 on ramp. Construction may begin and/or end approximately 500 feet ahead of or beyond the actual project limits to accommodate transitioning the pavement.

 

The existing roadway on this segment of I-80 generally consists of 12-foot-wide composite lanes that vary in number from seven to three, in both eastbound and westbound directions, and 12-foot-wide outside shoulders, of which 12 feet is paved in the westbound direction and 10 feet is paved in the eastbound direction, with composite surfacing, and 12.5’-foot-wide composite inside shoulders.

 

 

 

 

 

PROJECT LOCATION (Click image for larger view)